How we build
The schedule behind every HP project
Typical timelines, every stage of a pool build, and the standards each project is held to.
5.0315 reviews from the clients we are privileged to serveYour project, in five steps
- Step 01

Project brief
It begins with you. Tell us the service, the address and the scope you have in mind, and send photographs of the property with any inspiration or rough design you have gathered.
- Step 02

Review and fit
Our team studies every brief and replies personally. We take on a limited number of projects, so we confirm early that yours is one we can serve to our standard.
- Step 03

Consultation
Reserved once your brief is complete. Because we arrive prepared, the conversation is about design, materials and how you wish to live outdoors, not guesswork.
- Step 04

Design and scope of work
Layout, materials, lighting and planting are drawn and refined alongside you, then set out in a written scope and a line by line proposal.
- Step 05

Plan construction
We set the schedule, secure permits and reserve each specialist. Then the work begins, with care for your home and your privacy.
Typical timelines
How long projects take
| Project | Design | Permits | Construction |
|---|---|---|---|
| Custom pool and spa | 2 to 4 weeks | 2 to 6 weeks | 10 to 16 weeks |
| Full yard transformation | 3 to 6 weeks | 2 to 6 weeks | 12 to 20 weeks |
| Outdoor kitchen or pergola | 2 to 3 weeks | 2 to 4 weeks | 3 to 6 weeks |
| Pool remodel | 1 to 2 weeks | 1 to 3 weeks | 3 to 6 weeks |
| Patio, walkway or concrete | 1 to 2 weeks | Often none | 1 to 3 weeks |
| Landscape, sod or irrigation | 1 to 2 weeks | Usually none | 1 to 2 weeks |
Typical ranges for College Station & Bryan. Your written schedule sets your exact dates. Weather, inspections and material lead times can move them, and we tell you the day we know.
Inside a pool build
Ten stages, four inspections
Every HP pool follows the same sequence. Nothing moves past an inspection until it passes.

- 01
Layout and locates
Survey, stake the pool and call in utility locates before any digging.
- 02
Excavation
The shell is dug to the engineered depth and spoil is hauled off the same week.
- 03
Plumbing roughInspection
Suction, returns, skimmers, water features and gas stubs, then a pressure test.
- 04
Steel and bondingInspection
Rebar tied to the engineer's schedule with the bonding grid, then inspection.
- 05
Gunite shell
Shotcrete placed and hand finished, then watered and cured.
- 06
Tile and coping
Waterline tile, coping and stone set to the drawing.
- 07
Decking
Forms, steel and pour or pavers, with drains and joints planned around the pool.
- 08
Equipment and electricalInspection
Pump, filter, heater, lights and automation set and wired, then inspected.
- 09
Interior finish
Plaster or pebble finish, then the pool is filled and the water started up.
- 10
Final inspection and walkthroughInspection
Barrier and safety items, final inspection, then we walk every detail with you.
Our standards
How every project is run
Weekly updates
Your project lead sends a schedule update every week: what finished, what is next, and anything we are waiting on.
Inspection gates
Each city inspection is a gate. Work does not move to the next stage until it passes.
Changes in writing
Every change is priced and signed as a written change order before the work happens.
Weather and lead times
Rain days, freezes, inspection timing and material lead times are built into the schedule and flagged early.
A clean site
Work areas are cleaned and secured at the end of every day.
Care guide at handoff
You receive a care guide at the final walkthrough.
Reserve your place on our calendar
We accept a limited number of projects each season, so every one receives our full attention. Consultations are reserved for clients whose project brief is complete.
Begin Your Project BriefLimited availability
Plan your project
Our calendar is full because our work is. Share the service, the address, your scope and your photographs, and our team will review it personally. Consultations are reserved once your brief is complete. If our virtual assistant greets you first, know that a project lead will follow up, and that a call from us means your project has our full attention.
- 1Project brief
- 2Review and fit
- 3Consultation
- 4Design and scope of work
- 5Plan construction